
the chatree gold mine (cgm) is situated approximately 280 by a two stage grinding circuit comprising a sag (2.75 mw) and ball mill (4. the chatree gold project located 280 km north of bangkok in the,chatree gold mine thailand smedg,production years yr1 yr2 yr3 yr4 yr5 yr6 yr7 material mined (000s bcm) 1,255 840 2,550 3,400 2,983 1,012 - strip ratio 1.6 0.8 2.7 3.9 3.5 2.1 - mill production (000s tonnes) 938 1,000 1,375 1,500 1,500 1,500 391 gold equiv recovered (000s oz) 146 137 145 104 123 92 10